Обеспечение антикоррозионной защиты и поддержание её высоких эксплуатационных характеристик являются одними из наиболее важных факторов, гарантирующих надёжность и длительный срок службы трубопровода. Комплексная программа мероприятий по антикоррозионной защите осуществляется на всех этапах — как производства труб, так и строительства и эксплуатации трубопроводов.
BN M 4 Ecobit GOST 6617-66 construction bitumen
Petroleum bitumens used for construction work in various sectors of the national economy - waterproofing, roofing, tanks, preparation of bitumen mastics, varnishes, masses, sealants
Construction bitumen BN M 4 Ecobit is used for bitumen waterproofing of concrete structures; for bitumen waterproofing of foundations; for preliminary priming of the base under soft roofing. Construction bitumen BN M 4 Ecobit is also used for the production of bitumen mastics, bitumen primer, hydrostekloizol, etc. Construction bitumen BN M 4 Ecobit is produced in 50 kg briquettes. Bitumen waterproofing is the cheapest of all types of waterproofing for concrete and foundations. Bitumen waterproofing is melted bitumen bitumen BN M 4 Ecobit applied to the surface of concrete (foundation). It is possible to add solvents White spirit, naphtha, or kerosene (gasoline) to bitumen BN M 4 Ecobit. Bitumen waterproofing with the use of open fire is possible only in places where it is permitted by fire safety regulations; in other cases, bitumen BN M 4 Ecobit and the solvents specified above should be used for bitumen waterproofing. Ready-to-use bitumen mastic, which already contains a solvent (fire-free type of bitumen waterproofing), can also be used for bitumen waterproofing. This type of bitumen waterproofing is more expensive, but much more economical in terms of time. Both internal and external bitumen waterproofing is possible. The choice of waterproofing (whether it is bitumen waterproofing, waterproofing with roll-on materials or waterproofing with dry mixes) depends only on individual tastes.
GOST 6617-76 Construction petroleum bitumens
1. GRADES AND TECHNICAL REQUIREMENTS
1.2. Construction petroleum bitumens are produced in the following grades: BN M 3 Ecobit, BN M 4 Ecobit, BN M 5 Ecobit. The correspondence of the established standard grades of petroleum bitumens to those previously adopted is given in the appendix.
2. ACCEPTANCE RULES
2.3. The manufacturer determines the solubility and mass fraction of water periodically once every 6 months, the change in mass after heating and the flash point - once every 3 months.
2.4. If unsatisfactory test results are obtained for at least one indicator, repeat tests are carried out on a newly selected sample from a doubled selection.
The results of the repeated tests apply to the entire batch.
3. TEST METHODS
3.1. Physicochemical parameters are determined using the methods specified in the table.
3.2. Samples of petroleum construction bitumens are taken according to GOST 2517. The mass of the combined sample of each grade of bitumen should be 0.5 kg.
4. PACKAGING, MARKING, TRANSPORTATION AND STORAGE
construction bitumen grade BN M 3 Ecobit is packaged and transported according to GOST 22245;
It is permitted, by agreement with the consumer, to transport construction bitumen in packaged form in accordance with GOST 26663;
when packaging and transporting construction bitumen, safety regulations for products of the oil refining industry must be observed according to documentation approved in the established manner.
5. MANUFACTURER\\\\\\\\\\\\\\\'S WARRANTY
5.1. The manufacturer guarantees that construction petroleum bitumens comply with the requirements of this standard, subject to the conditions of transportation and storage.
5.2. The guaranteed shelf life of construction petroleum bitumens is one year from the date of manufacture.
6. SAFETY REQUIREMENTS
6.2. During the production, discharge, filling and sampling of construction petroleum bitumen, special clothing and personal protective equipment must be used in accordance with standard industry standards approved in the established manner.
6.3. In case of fire of small quantities of construction bitumen, it is extinguished with sand, felt, foam fire extinguisher, special powders; fires of spilled product over a large area are extinguished with a foam jet or water from monitor nozzles.
Technical specifications
No |
Name of indicators |
BN M 3 Ecobit |
BN M 4 Ecobit |
BN M 5 Ecobit |
Метод испытаний |
1 |
Needle penetration depth at 25 °C, 0.1 mm |
41-60 |
21-40 |
5-20 |
According to GOST 11501 |
2 |
Softening temperature along the ring and ball, °C |
50-60 |
70-80 |
90-105 |
According to GOST 11506 |
3 |
Extensibility at 25 °C, not less |
4,0 |
3,0 |
1,0 |
According to GOST 11505 |
4 |
Solubility, %, not less |
99,50 |
99,50 |
99,50 |
According to GOST 20739 |
5 |
Change in mass after warming up, %, no more |
0,50 |
0,50 |
0,50 |
According to GOST 18180 |
6 |
Flash point °C, not lower |
230 |
240 |
240 |
According to GOST 4333 |
7 |
Mass fraction of water |
Следы |
Следы |
Следы |
According to GOST 2477 |
|
|
|
|
|
|
|
|
|
|
|
|
Working with hot bitumen is very dangerous.
What are the safety rules?To prevent accidents when working with hot bitumen mastic, it is necessary to strictly follow the safety rules. Bitumen cooking boilers are installed on leveled free areas.
To prevent liquid bitumen from getting into the fire (in case of fire heating), the boiler is installed with a slight slope to the side opposite the firebox. A box with sand and a fire extinguisher should be located near the boiler.
When cooking bitumen mastics, it is necessary to strictly follow the rules for mixing bitumen of different grades. Thus, during the melting of low-grade bitumen, only after the formation of foam has ceased, bitumen of higher grades is allowed to be added.
Lower grades of bitumen should not be added to melted bitumen, as this may cause significant foaming and the contents of the boiler will splash out. Pieces of bitumen are lowered along the side of the cooking boiler to avoid splashing of the boiling mass.
The boiler should not be loaded with bitumen more than 2/3 of its volume. To prevent hot mastics from splashing during transportation, conical tanks must be covered with lids and filled only 3/4 of the volume.
The lowering and lifting of tanks with hot mastics must be mechanized. To work with hot mastics, workers must wear glasses, leather boots, canvas suits and gloves.